Sunday, 15 September 2024

Paint- Deck.

I must learn to embrace painting.
Links to assist in doing a better job….

Whatever the anti-skid is, it was very hard, and could only be removed with a grinder.  Hot, dusty work.  
























do not enjoy painting.   Anything.


The deck coatings were in terrible condition, The top layer was peeling in places and oxidized everywhere else, and the base layers was failing in places, particularly adjacent to hardware.  In some cases there was pitting evident, the worst of which was around the hinges on the anchor locker hatches.   The poor paint condition was Sakura's most obvious deficiency and is the single biggest remaining refit task, so I began to address this in August 2024.  

I decided to tackle the more complex areas first, particularly those requiring hatch and hardware removal/replacement.   This meant the bow, the cabin top aft of the mainsheet traveller, and the transom and aft end of the cockpit.  As of September 2024. the area painted may represent about 25% of the total deck area.   Much of the remainder is open deck space and is more straightforward.  

The paint was applied with brush and roller in 35 deg heat, in a dusty boatyard.  Less than ideal but the initial results were encouraging.  I painted at the beginning and end of day to avoid the most intense heat and sun.

The paint system ended up being all International products. with Primocon or interprotect 200e as primers and Interthane 990 as the finishing coat.   For non-skid I will likely use Kiwigrip.

Removal of hardware

Removing the hardware requires some technique and patience, good screwdrivers, penetrating oil, a blowtorch, and impact driver, and if all else fails a good centrepunch, quality drill bits and a good quality drill that can operate in heat at low speed without self-destructing.  Hurrying takes longer.

The hardware was typically insulated from the deck some kind of adhesive material with a layer of plastic - about the thickness of heavy (10 mil?) electrical tape.  I replaced this with sheet rubber on hinges and latches, and fibreglass sheet (laid up in my shop at home) cut to shape.  The rubber was a bad idea.  Too stretchy.  I made some more sheet fiberglass, and had to re do 5)3 hinges and latches.  Thanks Robert.  .  Hurrying takes longer. The sheet fibreglass was perfect.  Butyl tape was used for bedding/sealing and tefgel was applied to both the tapped hole and fasteners.  

Preparation of existing surfaces.

To start, I scrubbed the area with a cleaning/de-greasing soluton.   I found that an angle grinder with 80 then 120g disks was the best way to remove the thick non skid coating and to remove any mild pitting. I then learned that one of these silicon/fibreglass tools is as good or better for the first pass.

  I did use a wire scratch wheel, and while it helps for certain things, it is not the best, and is certainly more dangerious than I realized.   (I found many bristles embedded in various locations on my unprotected self hours later, like forgotten accupuncture needles.  Thankfully no harm done)    Due to the thick buildup of coatings and filler, this sanding generated gallons of dust.  A real mask, goggles and lighweight coverals are essential.  The yard guys weare a balaclava type hood as well.  I wore a hat.

Random pics below.   





















   







Saturday, 14 September 2024

Bottom paint

Sept 2024 update

Sakura's bottom had a build up of several systems of bottom paint, capped with a thick rubbery tar-like substance.  I had received and acceepted a quote from the yard for a new bottom, (sand to primer and apply new antifouling) estimated at 25 hours of labour.  Yard management changed before the work commenced and they would not honour the quote.   Bad business but perhaps astute - the rubber coating immediately clogged any normal abrasive medium.   Sandblasting was briefly investigated and in the end, I spent an unplanned  20 hours myself, employing various means to remove this stuff.   This left a very hard blue material ("probably toxic and illegal now") over the base primer with some areas where a red material had been used, presumably for touch ups.  

At this point the yard took over and the bottom was sanded to original primer, over which 2 coats of interprotect 200e were applied to above the bootstripe, which was sanded to be free from corrosion and will also be repainted prior to launch.  It cost more than the original quote, and this does not include antifouling...






Day 1, below.  No coveralls.  (Day 2... tyvek coveralls)















   



Prior Post

https://www.pbo.co.uk/expert-advice/how-to-apply-kiwigrip-to-your-deck-88409?utm_term=7205239C-4120-4AC5-8166-384F77D929FD&lrh=a07c737352f6204b1b308b0cac2531dda93d5ba1fe093128afc8a7f3e1d7691e&utm_campaign=F0BD7058-F52D-447F-B2FD-A269004F0791&utm_medium=email&utm_content=D69E8830-8226-4293-945F-513BC95A0F45&utm_source=SmartBrief



 ugh.

Have been dreading this part of the refit.

primocon and seajet 117 were recommended as brushable primers.

I bought a gallon each of Primocon and Pettit EZ-poxy

Visited Atlas tools today and apparently this sander is the way to go.

Under construction 

JJ recommends SeaJet 017 or Primocon primer, Awlgrip with H3002 brushing converter for the hull.

Dealing with the failing paint will be the biggest job of all.  I know little about this subject.

Primers

https://www.interlux.com/en/us/boat-paint/primer/primocon

Discussion on blistering, repairs

https://www.morganscloud.com/2011/05/01/its-painting-time-again/

Refit: Feb. 2023 Survey Findings and Progress

SAKURA completion of survey recommendations as at 10/16/2025

Guide to symbols used
    Complete, meets or exceeds survey recommendations. 
🚧     Currently being addressed.
🌊    Intentionally deferred until launch in 2025.

 

A1 Keel/Rudder - repair hydraulic system. ✅

  • Centreboard hydraulics control raising of the centreboard, but when switched to lowering mode, boards  descends freely.  March 3-6, 2023 - Fuse in keel pump is in working order.  Pump lubricated, pivot pins replaced. Now operates freely and smoothly.   
  • Centreboard cylinder was rebuilt, new, spare aboard.   See also rudder operation, item A12.    
  • Both rudder and centreboard have all new delrin bushings, stainless and alu axles/pins, and new or rebuilt hydraulic cylinders, entire system inspected and renewed.  
  •  Hydraulic system was flushed and bled and the correct fluid was used.  Spares aboard.

A2 Thru Hull depth sounder leak 

  • Per surveyor - Sender identified as leaking was replaced with DST810, installed 3M 5200.    May 2024

A3 Dripless prop shaft seal leak 

  • November 2025- shaft seal replaced with new.  See also C9.

A4 Extinguisher Cert    

  • Extinguishers and fire suppression inspected and recertified Nov 2025, BV Safe in Willemstad.  
A5 Expired Flares        

  • Flares updated October 2025

A6 Fixed fire suppression cert.  

  • Extinguishers and fire suppression inspected and recertified Nov 2025, BV Safe in Willemstad. 

A7 Life Raft Cert.   ðŸŒŠ 

  • A4-A7 These items were purchased new in 2019, and are within Canadian standards for re-cert.   To recertify in 2025. (there is no agent in Curacao.)  
  • Plastimo agents are in Puerto Rico, St. Thomas USVI and St. Martin.  Appointment has been made to service raft weeks of Dec. 10-19 in St. Thomas, USVI.

A8 First Aid kit  ✅

  • March 3-6, 2023  a first aid kit was not found during survey, but there was one was aboard.  
  • A much more comprehensive medical kit now aboard, with a second kit in ditch bag. 

 A9 Smoke Detector 

  • Installed June 2023. 

A 10 Ditch Bag contents not adequate

  • Ditch bag acquired and outfitted, updated flares aboard.   Requires only food, water, prior to launch.  


A 11 Portside bilge Pump not working  

  • March 3-6 2023. Repaired. This is a new pump that had been incorrectly wired by the prior owner.  A replacement pump, plus 3 rebuild kits are now aboard.   improved strum boxes have been installed and limber holes have been cleared of debris.  

A 12 Rudder Hydraulics Leaking  

  • May 2024 Rudder cylinder replaced with new, system purged and bled, now functioning perfectly.   Both rudder and centreboard have been completely rebuilt with new delrin bushings, stainless and alu axles/pins, and new hydraulic cylinders.   System was flushed and bled and the correct fluid was used, pump inspected cleaned and worn parts replaced.    
A 13 Replace gas lines.  
  • Gas lines, regulator, tanks and range replaced June 2023.  See also C8.

B1Replace Keel box anodes 

  • May 2024. Keel box anodes were owner-added and are not advised per the factory.   These and any traces of stainless steel fastenings were removed.  

B2Bilge corrosion cleaned, Mag anodes in water tank.  

B3 Straighten anchor platform  

  • Anchor platform flange straightened, Selden sprit, the likely cause of the damage to the anchor platform, has been replaced with the correct OEM bowsprit fitting. This is vastly superior in design and construction. Bent anchor roller shaft has been replaced as has worn anchor roller.  Area was primed painted and assembly greased and reinstalled May 2024.

B4 Head sink drain hose kinked 

·        Replaced with MPI series 110 soft wall wire-reinforced hose.

B5 Hydro generator cable slack  

  • Hydrogenerator cable replaced and unit serviced and operation verified. New bracket installed .

B6 Corrosion at steering pedestal base 

  • Cleaned inspected and polished Nov 2025.

B7 Antifouling Paint ðŸŒŠ

  • Bottom has been stripped and painted with Interprotect 200e, will receive antifouling just prior to launch. 

B8 Cutlass bearing - monitor   

B9 Chafe protection at cable exit on mast  

  • Corrugated trunking installed to protect all cables May 2024.


B10 Halyard Chafe ðŸŒŠ

  • All new lines are aboard but will be rove only prior to launch to prevent UV degredation.

C1 Exterior paint  ðŸš§  

  •  Foredeck, cabintop and transom area have been stripped, primed with International Primocon and painted with Interthane 990.  Repaint will be complete mid-November 2025.

C2 Hull dent  

  • minor cosmetic issue now undetectable with hull refinish. 
C3 Deck hatches some crazing  
  • Deck hatches were reglazed and hardware renewed, sunbrella hatch covers made and installed.
  • large inventory of hardware spares abord.

C4 Windows, possible leak   

  •     Area Sealed

C5 Stanchions Bent  

  • March 3-6, 2023 Stanchions were inspected and straightened, bent units replaced with new, spares aboard as well.   New, heavier, uncoated SS lifelines installed Sept 2024.

C6 Check cabin heat 

  • Heater disconnected Oct 2023, to be relocated.   Nov 2025 hoses rerouted to prevent damage, heater to be relocated in December. 

C7 Refrigeration running irregularly 

  • March 2023 -Condition identified in survey is a consistent with seawater-cooled refrigeration operating out of water.  
  • Refrigeration system verifed in 2024, tested with 2 weeks' subsequent use with temporary coolant supply.   

C8 range  - Service and repair   

  •  See also A13.   Range replaced with NEW Force 10 unit. 

C9 Engine- Service   

  • Service competed, mixing elbow replaced March 2024.  See also A3.  

C10 Engine RPM topped at 2450. 

  • See C9 - clogged mixing elbow.

C11, C12 Shore Power Ground isolation

  • August 2024 Inlet replaced with new, correctly configured Hubbell unit.
  • Victron 3600VA automatic isolation transformer installed Oct 2023.

C13 (same as B2) clean tanks, Mag anode installed  

  • Replaceable magnesium anodes installed during refit, 2024 refit, spares aboard.  

C14 Radar  ðŸš§

  •  All instruments are in good working order except radar dome or its cable.   CMZ to address, Nov 2024. 

C15 Wind instrument NF, likely sender or wiring.  

  • All older electronics were removed in 2025 and updated with new B&G instruments.  
  • Bluetooth deck sender installed may 2024, masthead sensor to be paired and installed, Nov 2025

C16 PFD inspection 

  • PFDs are in excellent condition.   Ocean systems 150N harness with UML mk5 autoinflators,

C17 Nav lights not tested

  • March 2023, existing  aqua signal 40 Nav lights are all in working order.  
  • 2nm Hella LED nav lights purchased for installation Nov 2025.

C18 Hull Corrosion/Paint  

  • Bottom has been stripped and painted with Interprotect 200e, will receive antifouling just prior to launch.  Foredeck, cabintop and transom area have been stripped, primed with International Priomocon and painted with Interthane 990.  Topsides have been stripped and sanded and will remain unpainted. 
C19 Boom Gooseneck requires nylon washer.  

  • May 2024 undersized gooseneck bolt replaced with 7/16" , SS load washer installed.  gooseneck greased, inspected, etc.

C-20 Genoa furler bar bent, straighten. 

  • Furler rebuilt and bent parts replaced with new.

C-21 Service Winches  

  • Winches removed, cleaned and fully serviced Feb 25.   Reinstalled with new fiberglass isolating pads and butyl bedding compound.

C-22 Replace rubber winch buttons.  

  • replaced Sept 2024, spares aboard

Sunday, 9 June 2024

Clothing aboard

Under construction

Dave's clothing
1 tilley hat
3 beach towels
1 pullover fishing shirt  (more I think)
4 collared fishing shirts
6 pairs socks
3 pairs underwear
1 bathing suit
1 pair jeans
1 linen dress shirt
5 pairs various shorts
1 pair teva sandals
1 pair deck shoes

Bring:
Merino stuff and cargo pants

Foul weather clothing
1 pair size 12 sea boots
1 pair size 10.5 sea boots
1 pair size 42 (size 9) sea boots

1 musto offshore foul weather jacket
1 musto bib pants (for same) 
1 Musto HPX dry suit, XL
 1 sail rain suit - large 
Various fleece tops
Various windbreakers
3 toques
other hats





 Under construction









Posts by Subject

Most popular posts