Next trip
Do in advance
- make replacment wood panel for nav station DONE
- repair pod. make cover panel DONE
- new ALU or glass panel for MFD DONE
- black acrylic strip for breaker panel 1.125" X 7.375". DONE
- 1/2” Black acrylic strip for label bearing call sign, MMSI etc. width of vhf.
- Apply for MMSI AND radio station licence DONE
- Register EPIRB.
- Make DC breaker panel.
- Ensure Victron, b&G apps, and B&G AIS programming software are loaded onto laptop.
- DRILL Bit for switches
- make switch panel for drop-front cabinet. approx 14" wide
- Make cutting board. Under way
- make fabric covers for deck lights
- make Oak closet rod supports
- powered USB splitter for ESD drive?
- Make nema female adaptor to Euro plug
Order in advance
- Order N2K cables, splitters, closures DONE (rog, Luggage)
- Order red/white fixtures. DONE (rog, luggage)
- Standard horizon GX1850B vhf, and SSM70h wired remote mic. DONE AMCAR
- Order Icom MB109 clip to repair HH VHF. DONE AMCAR
- order parts for Sailgen. DONE AMCAR
- ring buoy. DONE AMCAR
- Order another lithium battery…. DONE AMCAR
- Plastimo 29404 compass hood. DONE LUGGAGE
- Simrad/B&G adaptor cable 0127-56. DONE AMCAR
- order red and black hookup wire for LV DONE AMCAR
- order bosch GET75 sander DONE AMCAR
- Lubriplate 130-AA Grease for max prop DONE AMCAR
- bag for grinder (not blue). DONE (luggage)
- Marinebeam deck/steaming light DONE AMCAR
- Brady labels https://www.bradycanada.ca/resources/guides/bmp21-plus-labels-guide DONE, Luggage
- 3/8 white on black for panel M21-375-595-BK
- 3/4" black on white for wire marking. M21-750-499
- 10/2 600v boat cable 18’ DONE
- kiwi grip grey 2 gal.
- drag link socket
- https://www.makitatools.com/products/details/191657-9
- 3m strechy tape
- cutting mat for chart table
- bottom paint (yard). Underway
- order 6" sanding disks
- dan buoy
- Flares Paines-Wessex mk8 pinpoint,($50/3) Mk8A parachute ($127/3), MK9 smoke ($50ea) or 3 pack orion smoke
- Tefgel
- two fans - calframo ultimate
- 10mm washers for vang base
- curtain fabric Fabricland (blue) 21840 21.99<20% pitch black 7635AD $19<50%
- pelican 3310 flashlights. Underway
- one Better homes and Gardens small canister
- Order acrylic for remaining deck windows 8mm, 12.5"X81"
spare latch hooks Whitewater marine 2600SS. - autopilot remote. Wait
- Light coveralls & respirator if paint is to be removed.
Bring
- Large Ziplocs DONE
- switches/ panel for drop down space DONE
- Pigtails for VEdirect. DONE
- small roller handle DONE
- drills for screw removal.DONE
- tefgel brushes. DONE
- good small tap handle. DONE
- eye protection DONE
- nitrile gloves. DONE
- more chinese peppers and mushrooms DONE
- Metric taps. DONE
- 12mm socket DONE
- Spare wind vane paddle DONE
- Rubber mat for battery box 24”x30”. DONE
- Order new start battery
- Charger Fuse 200a midi or bf1 bolt down automotive fuse
- bigger ball peen hammer underway
- pill bottles for parts under way
- Electrical tape INDER WAY
- paint stir sticks
- prefeeder and velcro for furler
- Acrylic for drawer repair BRING
- FHMS M5, 10mm, SS
- Staple gun+staples
- Chisels
Do while there
- on the hard - prop. zincs, close hydraulic panel
- complete hydraulic pump reassembly
- Inspect steering per survey
- Fire ext cert per survey
- troubleshoot battery charger
- revise electrical panel and label
- revise positive wires for low voltage, 8 cct & gnd
- complete 230V receptacles
- 12v to inst housing, install chart plotter.
- remove remaining NMEA0183
- secure splitter blocks in SS cockpit locker
- Secure NMEA cabling to helm pod
- Install VHF remote cable
- measure topside windows
- Install new nav inst panel
- Measure for tv
- install shore power inlet
- wire pins for breaker and inverter connectors
- install reading lights
- sort keys that yard has
- Install VEdirect wiring
- washers for vang base - 10mm nylon or?
- split gland at cable in cockpit
- bedding for aft cabin
- Determine radar situation
- Install nav lights
2-3 more 14" parts boxes from Goisco
usb power for ESD drive?
paint!!
Nav tools holder?
source vang gooseneck fitting
staple and glue Velcro
circlips for rigging
Make anchor snubber
choose kiwi grip
rope for lazy jacks
small roller handle DONE
brush for vaccuum
staple gun and contact cement
engine mounts
helm seat
FHMS M5, 10mm, SS
replacement pump link
investigate watermaker - seawater pro, ask for Mike
Do before
Do in advance
- Weld cover for cb pin DONE
- Make mast ascender
- Wind vane paddle. Done
- Understand requirement, to change MMSI and AIS
- make 14/3 and 10/3 adaptors for shore power
- 5-15p to shore DONE
- L30P to IEC309 blue connector body 10AWG
- 5-15R tp IEC309 plug 14 AWG
- prepare for reset of LiFePo BRING ps DONE, Failed
- Order Graphics (STARTED). Done
- Confirm GEWISS DONE
- download victron and B&G apps DONE
- arrange bottom paint. DONE
- more Butyl BRING DONE
- courtesy flags DONE
- Magnifying glasses, BRING DONE
Order
- plastimo bilge pump rebuild parts DONE
- 2 fans
- propane solenoid and switch
- remaining interior lights 2
- a few exterior handles for GEBO 89.65.01.05
- M8 machine screw asst
- UML Mk5 autoinflators 4 pcs
- Spare ensign
Sent in advance
- BEDDING, SHEETS FROM COSTCO. Done
- plastimo bilge pump rebuild parts DONE
- topper mattress DONE
- Door hooks DONE
- BATTERY CABLE 2awg for house. (fuse @100a). DONE
- 10/3 boat cable. DONE
- M8 (5/16") lugs, asst awg DONE
- Circlips for rigging. DONE BUT GET GOOD ONES IN FRANCE
- Extension cord. DONE 25’ 14awg
- Sheet g10 DONE
- order Autopilot. DONE AMCAR
- thread/sewing kit. DONE
- Arrange engine service. DONE
- Canisters for galley. DONE 4
- 12mm, 22"X28" 2074 grey tint. DONE
- ditch bag DONE
- Order paint and primer DONE
- Seaview SP2S1 helm Pod DONE
- Order Line - halyards, reefing lines and sheets, DONE
- Anchor roller DONE (in luggage)
- cotter pins shackles and hardware. AMCAR
- hand cleaner. DONE
- countersink bit. AMCAR
- Water filters AMCAR
- screwdrivers philips screwdrivers in luggage DONE
- 1" hole saw for hydrovane DONE
- 1/2" and 3/4" split loom DONE
- one or two more tool bags. AMCAR DONE
- velcro wraps - various colours. Luggage DONE
- HD cable ties. Luggage DONE
- rubber matting for lockers in luggage (DONE)
- lights for heads. AMCAR DONE
- 120v inverter. ORDERED AND AT AMCAR
- Stereo https://www.garmin.com/en-CA/p/635318/pn/010-02138-00#overview. AMCAR DONE
- lightweight clothing, Tilley Hat, Sandals DONE
- Beach Towels DONE
- Cooler bag. Sent DONE
- Tackle box sent DONE
- Sunbrella hatch covers DONE
- Remaining blocks, anchor shackles, clevis pins. DONE
- repair profurl drum DONErepair vang. - DONErefurb penn reels DONE
- JST PH connectors DONE
- LOXX fasteners DONE
- Teak pulpit seat DONE
- 4c 22 cable for VEdirect DONE
- OXALIC acid DONE
- pot lights 11ea DONE AMCAR
- reading lights 2 ea DONE AMCAR
- alloy screws for deadlights DONE AMCAR
- 6c mocha pot DONE
- NMEA 2000 cables and Tees DONE AMCAR
- Order DOW 795 DONE AMCAR
- Rudder Cylinder (DONE) AMCAR
- FILES DONE AMCAR
- sidecutters. Done
- linesman pliers. DONE
MISC for later
- 220v travel iron, bread make, popcorn?
- sheet material - glass, rubber
- better drill DONE
- sawzall
- Hose clamps
- Hefty hose 5/8 ID
To do while there
- pack away bed boards. Done
- Clean area below main berth DONE
- stow parts and materials DONE
- Sell surplus electrical DONE
- organize fishing gear DONE
- jug of coolant DONE
Electrical
- verify LiTime battery DONE - its bad
- remove inverter DONE
- install interior lighting DONE
- wire for trickle charger and remote inverter switch DONE
- wire for propane solenoid
- wire for Ethernet and VEdirect DONE
- figure out where transom light is switched. DONE
- install sail-gen wiring box and cable gland REplace cable instead - 10/2 boat cable
- Install DST800
- Remove wind sensor cable (fish)
- Remove Raytheon hardware DONE
- Install Stereo DONE
- Install new sender, chart plotter, wind DONE
- Install new gas detector/heat sensor
- Install autopilot DONE
- Add add chafe protection to sonar cable DONE
- Replace running lights with new Hella USCG LED (aboard, awaiting installation)
Mechanical
- repair mast chafe seal coax. DONE
- rebuild vang and install rebuilt genoa furler DONE
- install new roller and axles for anchor. DONE
- Deal with hydraulic cylinder. Install new cylinder and ensure operation DONE
- service prop and anodes
- install lifelines and stanchions
- replace 2 fixed plexiglass deck skylights (ship for April 2024) DONE
- Determine helm pod suitability DONE - ugh
- Verify pump- play DONE
- replace 4 cable glands for hydraulic hoses. split? DONE
- relocate heater (LATER)
- relocate start battery (LATER)
document/inventory
- Document staysail furler DONE
- Document dc distribution DONE
- Document through hulls
- Document cockpit cushions
- Document critical hoses
- Document required hand holds
- Document compass and pedestal cover design
- Document bedding for sheets. DONE
- Document engine belts
- Document engine mounts
- Document foul weather gear DONE
- document blocks and rigging. Done
- document clothing DONE
- Document how to make and stow cutting board - sink/range cover and bulkhead mount. ? Done
- Lifting harness for dinghy.
- document first aid supplies DONE
- document spares
- document tools
- template fitted Tool roll for wrenches
- measure large hatches for bug screens
- measure for Awning design.
- through hull leak. Done
- cert fire ext
- cert life raft
- replace running rigging (ship for April 2024)
Westec metal fab
Supports in galley shelf behind stove are broken. Likely others will FollowSilicone sheet for gasket Dimensions for hand holds Dimensions for Cockpit cushions How to secure teak slats on seatsWhat are tank lids? Template seat block
Can satellite antenna be moved?
Supports in galley shelf behind stove are broken. Likely others will Follow
Silicone sheet for gasket
Dimensions for hand holds
Dimensions for Cockpit cushions
How to secure teak slats on seats
What are tank lids?
Template seat block
Can satellite antenna be moved?
Oct 2023
Meet
- Ask shipyard about water blasting.
Prior to visit
apply for radio station license
make bow fitting, and stern seat, and hatch lid
buy more fabric
apply for MMSI
Apply for MI for HH
Bottom Paint - choose and plan timing Dinr and communicated to JJ
Repair cb covers
Knife tray. Done
Spare vane
Create graphics
Do
- Install nav lights
- Grease and inspect masthead sheaves.
- replace shore power outlet
- Block windows with cardboard from supermarket DONE
- remove all stanchions.
- assess pits in tanks.
- check deck fill leak
- determine tool storage strategy
- Touch up paint
- Inventory of blocks
- Determine galley drawers next steps DONE
Measure/document/photograph
- Engine mounts, including durometer stamp
- Stanchion sleeves in base
- Sail handling!
- Water tank lids, make, model, size.
- Shelf in fridge
- heater hose
- Anchor chain(s)
- screws for deck portlights DONE
- Dimensions and photos of ac outlets DONE
- Interior dimensions of oven and top of range
- Required anchor roller and sprit hardware DONEWhat is the dc infrastructure - shunt, fusing, switching?
Bring Home
- Buy/Bring
- Stanchion sleeves
- Spare vane
- Spare deck blocks
- Larger blocks and shackles
- adaptor for north american 30A shore power
- blue and brown 12 or 10 awg TEW
- seals kit and upper socket for maunal hydraulic pump
- impact driver
- M6X1mmX12mm hex bolts for rudder plate
- Toiletries, towel, shower shoes, athletic shorts, sun shirt, and personal stuff
- Phenolic sponges for SS. Done
- Hubbell parts. (Ordered fronAD April 6)
- key tags. Ordered. Done
- Tefgel. Done
- hangers
- flat bar stock.
- food canisters/mayo jars
- HD cable ties
- makita sanding discs
- fishing line done
- glass cloth, carbon, rollers.
- knobs for boarding laddder
- deck chairs
- decals
- solenoid
- split loom DONE
- porta power/jack
- pvc dinghy adhesive
- better thermos
- espar type heater hoses
- 3X calframo fans
- teak, oak
- delrin slides
Prior list for March, italicized is complete.
Do (Done)
- Move stuff to sail locker
- Remove rudder cylinder
- replace disc, verify operation
- Clean overall
- Brush and vaccuum bilge
- Clean water tanks. (Done but needs another go)
- Straighten stanchions. Determine which must be replace. Done
- Template seat block Done
- template sprit Done
- Install Deck Canvas
- troubleshoot bilge pump. Done
Europe
- GEBO portlight knob, other hardware
Measure and photograph
- gas lines etc
- Measure drawers Done
- nook behind rangeDone
- closet rod, Done
- broken catch, Done
- sink drain hose per survey.
- Stanchions, sleeve in base
- Dimensions for hand holds Done
- Dimensions for parts bins/tools.
- Cockpit cushions. Not required
- Template for teak slats on seats Done
- Tool stowage Done. not really
- Prop shaft dia 1" Done
- size of ensign 36" w
- dimensions of name lettering Done
- bilge pump and hydraulic pump handles, Done
- Triangle for rudder plate Done
- sink drain hose dimensions
- Water tank lids, make, model, size.
- Cabin heater hose
Document and Photograph
- Greases and lubricants Done
- Sail handling!
- Carefully Sort sheets and sails.
- Itemize pfd parts and foul weather gear Done
- More Clearly document Tools/spares Done
- Itemize First aid Done
- Itemize galley gear Done
- Running light models Done
- running light bulbs Done
- Ensure electronic tuff has correct adaptors Done
- Take all Batteries out Done
- Verify harken power winch switch number Done
- any unused line that can be used for refit of running rigging.
June trip
Meet
- Arrange engine service
- Edwin Versteeg $75
- Ask shipyard about water blasting.
Do
- Clean water tanks. (Started) and install anodes
- gas lines etc. replace
- Remove boom/disassemble vang.
- GEBO portlight knob
- flush and wash bilge
- free up furler.
- Remove faucets from heads and determine next steps
- Inspect/remove CB hydraulics and bushings
- Block windows with cardboard from supermarket
- Wash bedding
- Rebuld shower pump and verify all pumps
- remove rudder pin
- remove stanchions.
- remove bent anchor roller pivot bolt, stow anchor in locker
- Replace locks
- make clothes rod supports
- Sink drain from Erik
Measure/document/photograph
- Engine mounts, including durometer stamp
- Measure drawer depth
- Stanchion sleeves in base
- sink drain hose dimensions
- Sail handling!
- Water tank lids, make, model, size.
- Shelf in fridge
- heater hose
- Anchor chain(s)
Bring Home
- Curtains
- Vang Part
Buy/Bring
- 10/3 boat cable
- Hubbell shore power
- M6X1mmX12mm hex bolts for rudder plate
- Toiletries, towel, shower shoes, athletic shorts, sun shirt, and personal stuff
- 70mm mocha pot gaskets
- Fortress FX37 anchor (March)
- New strum box for fwd shower.
- Closet rod supports. (Feb)
- Pots, (March)
- drawer fittings
- cutlery
- puller. (Made in March)
- Anodes and hubs for water tank.
- sail bag
- interior lighting - linear and Princess auto dome.? (Ordered BA9s led and BA15 from Amazon)
- "Chinese" adaptor. (Made in April)
- Phenolic sponges for SS
- dielectric grease
- Hubbell parts. (Ordered fronAD April 6)
- Parts for rudder and cb (Ordered April 5 from alubat, ship to Canada)
- Tools per list
- key tags
- interior lighting - LED bulbs for existing fixtures to start
- Better wrenches and sockets
- Alu pipe for vang?
- Tefgel
- Tefgel
- Smoke alarm
- Gas alarm
- Hangers
Ship in advance
- Galley stove
- Propane tanks
- propane hose
- Line for running rigging
- Bilge pump kits
- Toilets/kits kits
- Engine parts
Prior list for March, italicized is complete.
Do (Done)
- Move stuff to sail locker
- Remove rudder cylinder
- replace disc, verify operation
- Clean overall
- Clean water tanks. (Started)
- Straighten stanchions. Determine which must be replace. Done
- Template seat block Done
- template sprit Done
- Install Deck Canvas
- troubleshoot bilge pump. Done
Europe
- GEBO portlight knob
Measure and photograph
- gas lines etc
- Measure drawers Done
- nook behind rangeDone
- closet rod, Done
- broken catch, Done
- sink drain hose per survey.
- Stanchions, sleeve in base
- Dimensions for hand holds Done
- Dimensions for parts bins/tools. Not required
- Cockpit cushions. Not required
- Template for teak slats on seats Done
- Tool stowage Done
- Bulbs from rect. fixtures
- Prop shaft dia Done
- size of ensign 36" w
- dimensions of name lettering Done
- bilge pump and hydraulic pump handles, Done
- Triangle for rudder plate Done
- sink drain hose dimensions
- Water tank lids, make, model, size.
- Cabin heater hose
Document and Photograph
- Greases and lubricants Done
- Sail handling!
- Carefully Sort sheets and sails.
- Itemize pfd parts and foul weather gear Done
- More Clearly document Tools/spares Done
- Itemize First aid Done
- Itemize galley gear Done
- Running light models Done
- running light bulbs Done
- Ensure electronic tuff has correct adaptors Done
- Take all Batteries out Done
- What are tank lids- cracked?
- Verify harken power winch switch number Done
- any unused line that can be used for refit of running rigging.
Sent from my iPhone
No comments:
Post a Comment