This list is perpetually under construction and seems long but isn't. (Comparatively…). It had been a running list of materials and tasks that was pages long, and included the hundreds of completed items. I finally decided to delete anything already done and reorganize the list for the final stages of refit.
Mark to bring
- volvo manual DONE
- Speaker bases DONE
- plastic for barriers 30X11
- guilders
- nav worksheet printouts
- AA and AAA batteries
- Surplus tylenol from home
- Gochugan DONE
- computer stuff per james DONE
Work to complete
Mark to bring mini PC, configure with
- openplotter
- Victron
- NoForeighnland
- Kodi
- sailfree
- prerdictwind
- boatyball
- duck duck go browser
- Nord VPN
- FB messenger
- VRM
- onedrive
Change survey date to 17AM
Cockpit
- Complete paint
- Complete rudder sensor install wire AP clutch DONE
- Repair broken gland DONE
- seal cable passages DONE
- document rose joints for drag link
- Can command mic cable be installed?
- lubricate steering
- nuts on winches
- install speakers
- install edson RAM arm
- improve winch button mounting
- snaps for dodger
- Label RPS DONE
- Flush Steering pump
- Do I have Lecomble and Schmidt manual?
Aft cabins
- Alejandro to complete vinyl install on Sat 15
- wire for fans
- install 50A breaker and splice rermaining heater hose.
- mount second mppt and DC:DC?
- remove surplus wiring from autopilot computer.
- install lighting upgrade.
- Consider ceiling fixture mid pt.
- Consider insulation NA in Curacao
- box rails for winch cover
Stowage
- keep duffel for cold weather clothes
- spares (hatch parts, CB bushings etc, ) DONE bins from Goisco
- critical docs in binder DONE
- celstial nav binder
- fishing stuff?
- fuses DONE - box from GOISCO
- ext cords and spare cable.
- can dock board be lashed to weather stanchions to secure diesel jugs?
Provisioning
- organize first aid supplies underway
- seasickness meds
- tylenol equivalent
- bug bite ointment
- bendryl
- Provisions inventory
- Ditch bag provisions?
- Create stores list
- enable Starlink. DONE
- confirm health insurance
- SORT MANUALS AND PAPERWORK DONE
- FILE box - five star binders ordered.DONE
- exercise data. DONE
- email laura (done) Gareth (Done) , and Carin DONE
- passwords. Under way
- charge and configures spare phone
Oct 27-Nov 14
- confirm furler prefeeder. Done NLA !!
- - Genoa
- buy 1 gallon paint DONE
- cert fire extinguishers DONE
- clean steering parts DONE
- buy and install start battery DONE
- meet with Carin,
- repair dodger strap, any other canvas
- install dodger snaps
- Awning?
- Complete any cockpit paint and install seats. underway
- install new anchor and verify operation with 'sprit
- mark anchor chain
- bucket for anchor chain. DONE
- Complete electrical list per below
Battery box area
- DC:DC charger to be programmed for Litime battery
- LOCATE SECOND MPPT to inside, repurposing the Wind generator wiring
- Install second MPPT, relocate first
- barrier strip on lid.
- check Alternator -ve and engine ground for isolation from hull
- build barrier for electrical area
- Cerbo connections
- check water heater for continuity and shorts.
- PAINT
- Sand hull Monday 10. booked Done
- bottom and boot stripe to be repainted. Schedule bottom paint and boot top. DONE
- Surveyor visit Nov 13
- Book launch Nov 17. DONE
- Confirm Starlink operation.
- prepare food for passage, provisions. Started
- Wash water tanks
- Assess diesel situation
- Replace prop shaft seal
- Install hydrocharger
- Check fluids
- Work on Arch (Requires yard's extension ladder)
- install stern light underway
- Remove panels and repaint arch underway
- install solar panels, and reconnect
- Install Comms bracket ?
Nov 14-29
- Launch
- Confirm engine operation
- Confirm fridge operation
- Inflate dinghy
- confirm alternator charging
- confirm hydrocharger operation
- Drill finger hole in large panel and fit small panel properly in stbd aft cabin
- repair ps aft cabin plywood
- Verify through hull clamps
- RE-rig
- inflate dinghy
- install masthead stuff
- install wind instrument
- replace masthead and steaming/deck light.
- remove prior wind instrument and cable
- troubleshoot radar cable
- Inspect and service masthead sheaves.
- order radar dome to ST thos. if necessary
- Label all through hull locations
- check hose clamps
- check jacklines
Nov 29-Dep.
- Masthead work
- Sea trials
- re rig and sails
- extra diesel
- gas for dinghy
Dec 13-31
- install fans
- install watermaker
- relocate heater. damaged hoses rectified
- add remote windlass control
- install command mic
- reprovision
- arrange PADI instruction
Do at home/Bring
- make cutting board for stovetop DONE
- make bases for lights DONE
- make bracket for satellite antenna. DONE
- make VEdirect cables 6' for inverter, 15' DONE
- make new solar panel brackets and reinforcements DONE
- evaluate inmarsat Not gonna fly. Have to go with starlingk. DONE
- make star board strips for shelf supports. (fridge, behind range). DONE
- Make helm seat. DONE
- Make knife block DONE
- Make 1/1/8" extensions for battery box lid DONE
- make seat brackets NO
- puckboard strip for stern ladder
- make cover for halyard winch motor
- Inside 10X14”,
- 2.5” high to clear motor
- Curve is minimal. Oddly
- make new cockpit cushions 59x20.25
- flashlight holders. Under way
- Glasses holder, whiteboard, binocs holder
- /paper towel/salt and pepper mill holder.thing
- make 14mm closet rod holders. Oak DONE
- repair horseshoebuoy bag?
- make thermos holder
- Make More G10
- Prepare mediacentre
- Handheld vhf charging
- make cutting board for stovetop DONE
- make bases for lights DONE
- make bracket for satellite antenna. DONE
- make VEdirect cables 6' for inverter, 15' DONE
- make new solar panel brackets and reinforcements DONE
- evaluate inmarsat Not gonna fly. Have to go with starlingk. DONE
- make star board strips for shelf supports. (fridge, behind range). DONE
- Make helm seat. DONE
- Make knife block DONE
- Make 1/1/8" extensions for battery box lid DONE
- make seat brackets NO
- puckboard strip for stern ladder
- make cover for halyard winch motor
- Inside 10X14”,
- 2.5” high to clear motor
- Curve is minimal. Oddly
- make new cockpit cushions 59x20.25
- flashlight holders. Under way
- Glasses holder, whiteboard, binocs holder
- /paper towel/salt and pepper mill holder.thing
- make 14mm closet rod holders. Oak DONE
- repair horseshoebuoy bag?
- make thermos holder
- Make More G10
- Prepare mediacentre
- Handheld vhf charging
Paint
- Sand toerails UNDERWAY
- sand/grind cabin top and paint DONE
- and side decks UNDERWAY
- touch up rails, bases
- investigate roll and tip of paint UNDERWAY DONE
- Kiwi grip
- finish cockpit and paint rest of deck
Misc
- Remove flashlight from cb trunk
- Repair ratchet on lug crimper DONE
- inventory above water skin fittings.
- Check screws and pads on hinges -fwd ps anchor locker, lowest helm seat plate, upper 3 on SS hatch lid
- re-glue vinyl in PS cabin DONE
Stern
- Tighten hose clamps on vents.
- install anchor roller
- Consider relocation of sailgen to PS or second bracket.
- Tighten Ladder
- connect shower hose
- devise deck protection from ladder
- install fishing rod holders, rescue buoy, outboard bracket
- Close access port in transom trunk
- Propane solenoid
Arch
Deck and Cockpit
- Reinstall bilge pump DONE
- inspect steering arm, Service and inspect steering. DONE
- split gland at cable in cockpit DONE
- Hydraulic oil
- remove and reinstall hyd pump
- Repair screw holes for table legs DONE
- make template for teak seat supports
- Install command mic
- install dodger snaps
- reinstall traveller screwsRedo speaker install
- reinstall seat slats with nylon m6 screws
- RPS install DONE
- evaluate grate at helm. repair?
- tighten lifelines
- install nuts on winches
- re-install stern cleats
- cut and relocate bimini frame tubes.
- repair dodger strap.
- install Wichard folding (or other) padeyes
- install running lights
- install helm seat and pulpit seat
- Could a demountable strut be made to support rope reel?
- Is bbq mounting bracket complete?
- check deck fill leak
- relocate heater (LATER)
- relocate start battery (LATER)
Belowdecks
- reinstall overhead panels
- Deal with headliner in PS aft cabinfalling vinyl DONE
- install comms and router
- small fuse block for ent
- Install water maker
- Revise heater location
- Install ball catch on electronics panel
- install reading/dome lights
- Finish 220v wiring
- Install satellite and router
- Fridges/freezer barrier
- wire for propane solenoid
- Install new gas detector/heat sensor
Order/Bring AMCAR
- Grease gun thing for lubriplate tube DONE AMCAR
- Plastimo stuff again (At AMCAR) DONE
- small lights DONE AMCAR
- plug for keel
- screws for plexi
- rocker switch for light
- sunscreen DONE AMCAR
- Calframo fans DONE AMCAR
- nitrile Gloves DONE AMCAR
- Tefgel
- piezo alarm DONE AMCAR
- releasble cable ties. DONE AMCAR
- CNN fuses DONE AMCAR
- anodes 110 (4.5")
- anodes 140mm 4.5 and 5.5"
- Harken stop blocks for furlers
- Selden stanchion blocks for furlers DONE EBAY
- TACTIX 320078 parts bin 14in
- hand cleaner and scrubbing pads DONE AMCAR
- M6 nylon screws DONE AMCAR
- Microfibre cloth DONE AMCAR
- Arrow T50 staples Monel #504M1, 1/4" DONE AMCAR
- whiteboard DONE
- 400w solar DONE - Renogy AMCAR
- flares DONE - AMCAR
- Paines-Wessex mk8 pinpoint,($50/3)
- Mk8A parachute ($127/3),
- MK9 smoke ($50ea) or 3 pack orion smoke
- Lewmar SHHP anchor DONE- AMCAR
- Lead blocks for furling DONE - garhauer AMCAR
- lightweight 120v ext cord for inverter 800w ORDERED Luggage
lightweight cord for 220VAC also ORDERED Luggage - Tool-less hold downs, M6. DONE LUGGAGE
- catch for electronics door. DONE LUGGAGE
- Loctite 263 (red) for making hold downs captive. DONE LUGGAGE
- Princess auto grinding discs, DONE Luggage - 10pcs X4.5"
- Scratch wheel of death DONE LUGGAGE
- Rags DONE LUGGAGE
- VICTRON mppt100/50 DONE LUGGAGE
- Small BT speaker LUGGAGE
- Foam rollers - AMCAR
- Starlink - ORDERED
- long usb cable for starlink.
- Reeds nautical Almanac
- Rubber mat for under cockpit grating
- UML Mk5 autoinflators 4 pcs
- Courtesy flags for Columbia, BVI
- Stir sticks fpr paint. Some
- M10, m8, m6 taps
- solder sucker
- knobs for electronics panel
- NEMA 5-15 Watertight
- guard for Makita grinder model number 9554NB
- Webasto heater hose - what is size? 3"/70mm sent
- Purchase start battery G31 Do in Curacao
- Order acrylic for remaining deck windows 8mm, 12.5"X81"
- curtain fabric Fabricland (blue) 21840 21.99<20% pitch black 7635AD $19<50%
- furler prefeeder and velcro
- and 80 grit, rigid discs to remove remaining nonskid. YARD TO DO
- More Mika sanding screen things
- Headlamp
- Plastics restore
- Reeds Nautical Almanac
- investigate thinner and painting best practices
- spools for dodger canvas
- spare latch hooks Whitewater marine 2600SS.
- coathooks
- Propane solenoid
- AAA and AA batteries costco $20
- ziplocs
- Pink thing for vane
- Small stanchion blocks for vane?
- Tackle for arch- outboard?
\Plug for keel. Photograph
cap for rudder bolts.switch for light,
Ext alarm for chartplotter (blue wire on Zeus) Alarm itself
Memory card for Zeus, cerbo. One packed
Cable gland Panzer gauge 13.5
cover for rhs of drop down is 12" X 5.75"
Pre-launch
- Recertify fire extinguishers
- survey
- Make anchor snubber
- Install Group 31 Start battery
- verify jacklines
- Batteries
- Jerry jug for water
- make Lifting harness for dinghy.
- FOOD/WATER FOR DITCH BAG
- stuffing box.
- verify dinghy
Provisioning
- Navy beans
- kidney beans
- lentils
- Rice
- capers
- sun dried tomatoes
- backpack meals, soups?
- bouillon
- Salt, Pepper (bulk)
- herb teas
- muesli
- powerdered milk
- baking powder
- flour
- couscous
- quinoa
- Vit C
- coffee
- herb tea
- hot chocolate
- dried fruit
- nuts
- laminate radio stn license and mmsi doc
- chili, stwes, rice
Propane solenoid
fabric for cabin lights
preplace switch in P/S aft cabin
Replace headliners
- Ensure Victron, b&G apps, and B&G AIS programming software are loaded onto ALL laptops.
- make fabric covers for deck lights
- Make nema female adaptor to Euro plug
- prefeeder and velcro for furler
- Determine radar situation
- Nav tools holder?
circlips for rigging
rope for lazy jacks
brush for vaccuum
document/inventory
- Document and indicate through hulls
- Document and assess critical hoses
- Document required hand holds
- Document compass and pedestal cover design
- Document engine belts
- Document engine mounts
- template fitted Tool roll for wrenches
- measure large hatches for bug screens
- measure for Awning design.
- determine tool storage strategy
- Water tank lids, make, model, size.
- Engine mounts, including durometer stamp
- Stanchion sleeves in base
- Shelf in fridge
- Anchor chain(s)
- adaptor for north american 30A shore power
- better thermos
- teak, oak
- material for delrin slides
- measure for jacklines and check
- sketch possible conclealed locker
- sketch possible fishing rod location
- nanuk cases
- shorepower adaptors
- 30a 125VAC NEMA M>IEC blue female (to adapt shore power)
- 15A 125VAC NEMA M > IEC blue female (to adapt shore power)
- IEC standard plug to NEMA Female - mark 125VAC only
- measure topside windows
- Measure for tv
- Measure for plexiglass panel to cover all sins below elect panels
No comments:
Post a Comment