Saturday 8 June 2024

Refit: List for next visit

Next trip

Do in advance

  • make replacment wood panel for nav station DONE
  • repair pod. make cover panel DONE 
  • new ALU or glass panel for MFD DONE
  • black acrylic strip for breaker panel  1.125" X 7.375". DONE
  • 1/2” Black acrylic strip for label bearing call sign, MMSI etc.  width of vhf.  
  • Apply for MMSI AND  radio station licence DONE
  • Register EPIRB. 
  • Make DC breaker panel. 
  • Ensure Victron, b&G apps, and B&G  AIS programming software are loaded onto laptop. 
  • DRILL Bit for switches 
  • make switch panel for drop-front cabinet.  approx 14" wide
  • Make cutting board. Under way 
  • make fabric covers for deck lights
  • make Oak closet rod supports
  • powered USB splitter for ESD drive?
  • Make nema female adaptor to Euro plug

Order in advance

  • Order N2K cables, splitters, closures  DONE  (rog, Luggage)
  • Order red/white fixtures.  DONE  (rog, luggage)
  • Standard horizon GX1850B vhf, and SSM70h wired remote mic.  DONE AMCAR
  • Order Icom MB109 clip to repair HH VHF.   DONE  AMCAR
  • order parts for Sailgen.  DONE AMCAR
  • ring buoy.   DONE  AMCAR
  • Order another lithium battery….  DONE  AMCAR
  • Plastimo 29404 compass hood.  DONE  LUGGAGE
  • Simrad/B&G adaptor cable 0127-56.  DONE  AMCAR  
  • order red and black hookup wire for LV DONE  AMCAR
  • order bosch GET75 sander  DONE  AMCAR
  • Lubriplate 130-AA Grease for max prop  DONE  AMCAR
  • bag for grinder (not blue). DONE (luggage)
  • Marinebeam deck/steaming light  DONE AMCAR
  • Brady labels https://www.bradycanada.ca/resources/guides/bmp21-plus-labels-guide  DONE, Luggage
    • 3/8 white on black for panel  M21-375-595-BK
    • 3/4" black on white for wire marking.  M21-750-499
  • 10/2 600v boat cable 18’ DONE
  • kiwi grip grey 2 gal.
  • drag link socket
  • https://www.makitatools.com/products/details/191657-9
  • 3m strechy tape
  • cutting mat for chart table
  • bottom paint (yard). Underway 
  • order 6" sanding disks
  • dan buoy
  • Flares   Paines-Wessex mk8 pinpoint,($50/3)  Mk8A parachute ($127/3), MK9 smoke ($50ea)  or 3 pack orion smoke
  • Tefgel
    • two fans - calframo ultimate
  • 10mm washers for vang base 
  • curtain fabric  Fabricland (blue) 21840 21.99<20%  pitch black 7635AD $19<50%
  • pelican 3310 flashlights. Underway 
  • one  Better homes and Gardens small canister
  • Order acrylic for remaining deck windows 8mm, 12.5"X81"
    spare latch hooks Whitewater marine 2600SS.
  • autopilot remote. Wait 
  • Light coveralls & respirator if paint is to be removed.

Bring

  • Large Ziplocs  DONE
  • switches/ panel for drop down space  DONE
  • Pigtails for VEdirect. DONE
  • small roller handle  DONE
  • drills for screw removal.DONE
  • tefgel brushes. DONE
  • good small tap handle. DONE
  • eye protection  DONE
  • nitrile gloves. DONE
  • more chinese peppers and mushrooms  DONE
  • Metric taps.   DONE 
  • 12mm socket DONE
  • Spare wind vane paddle  DONE
  • Rubber mat for battery box 24”x30”. DONE
  • Order new start battery
  • Charger Fuse 200a midi or bf1 bolt down automotive fuse 
  • bigger ball peen hammer underway
  • pill bottles for parts under way 
  • Electrical tape INDER WAY 
  • paint stir sticks
  • prefeeder and velcro for furler
  • Acrylic for drawer repair BRING
  • FHMS M5, 10mm, SS
  • Staple gun+staples
  • Chisels

Do while there

  • on the hard - prop. zincs, close hydraulic panel 
  • complete hydraulic pump reassembly
  • Inspect steering per survey
  • Fire ext cert per survey
  • troubleshoot battery charger
  • revise electrical panel and label
  • revise positive wires for low voltage, 8 cct & gnd
  • complete 230V receptacles
  • 12v to inst housing, install chart plotter.
  • remove remaining NMEA0183
  • secure splitter blocks in SS cockpit locker
  • Secure NMEA cabling to helm pod
  • Install VHF remote cable
  • measure topside windows
  • Install new nav inst panel 
  • Measure for tv
  • install shore power inlet
  • wire pins for breaker and inverter connectors
  • install reading lights
  • sort keys that yard has
  • Install VEdirect wiring
  • washers for vang base - 10mm nylon or?
  • split gland at cable in cockpit
  • bedding for aft cabin
  • Determine radar situation
  • Install nav lights 


2-3 more 14" parts boxes from Goisco


usb power for ESD drive?
paint!!
Nav tools holder?
source vang gooseneck fitting
staple and glue Velcro
circlips for rigging
Make anchor snubber


choose kiwi grip
rope for lazy jacks
small roller handle  DONE

brush for vaccuum
staple gun and contact cement


engine mounts
helm seat


FHMS M5, 10mm, SS

replacement pump link

investigate watermaker - seawater pro, ask for Mike


Do before





Do in advance

  • Weld cover for cb pin  DONE
  • Make mast ascender 
  • Wind vane paddle. Done 
  • Understand requirement, to change MMSI and AIS
  • make 14/3 and 10/3 adaptors for shore power
    • 5-15p to shore DONE
    • L30P to IEC309 blue connector body 10AWG
    • 5-15R tp IEC309 plug 14 AWG
  • prepare for reset of LiFePo  BRING ps  DONE, Failed
  • Order Graphics   (STARTED). Done 
  • Confirm GEWISS DONE
  • download victron and B&G apps DONE
  • arrange bottom paint. DONE
  • more Butyl  BRING  DONE
  • courtesy flags  DONE
  • Magnifying glasses, BRING  DONE

Order 

  • plastimo bilge pump rebuild parts  DONE

  • 2 fans
  • propane solenoid and switch
  • remaining interior lights 2 
  • a few exterior handles for GEBO 89.65.01.05
  • M8 machine screw asst
  • UML Mk5 autoinflators 4 pcs
  • Spare ensign 

Sent in advance

  • BEDDING, SHEETS FROM COSTCO. Done
  • plastimo bilge pump rebuild parts  DONE
  • topper mattress DONE
  • Door hooks DONE
  • BATTERY CABLE 2awg for house. (fuse @100a). DONE
  • 10/3 boat cable. DONE
  • M8 (5/16") lugs, asst awg DONE
  • Circlips for rigging. DONE BUT GET GOOD ONES IN FRANCE
  • Extension cord. DONE 25’ 14awg
  • Sheet g10 DONE
  • order Autopilot. DONE AMCAR
  • thread/sewing kit. DONE
  • Arrange engine service. DONE
  • Canisters for galley. DONE 4
  • 12mm, 22"X28" 2074 grey tint. DONE
  • ditch bag DONE
  • Order paint and primer DONE
  • Seaview SP2S1 helm Pod DONE
  • Order Line - halyards, reefing lines and sheets, DONE
  • Anchor roller  DONE  (in luggage)
  • cotter pins shackles and hardware. AMCAR 
  • hand cleaner.   DONE
  • countersink bit.  AMCAR 
  • Water filters AMCAR
  • screwdrivers  philips screwdrivers in luggage   DONE 
  • 1" hole saw for hydrovane    DONE
  • 1/2" and 3/4" split loom   DONE
  • one or two more tool bags. AMCAR   DONE
  • velcro wraps - various colours. Luggage DONE
  • HD cable ties. Luggage   DONE
  • rubber matting for lockers in luggage  (DONE)
  • lights for heads. AMCAR   DONE
  • 120v inverter.  ORDERED AND AT AMCAR
  • Stereo  https://www.garmin.com/en-CA/p/635318/pn/010-02138-00#overview. AMCAR   DONE
  • lightweight clothing, Tilley Hat, Sandals  DONE
  • Beach Towels DONE
  • Cooler bag. Sent    DONE
  • Tackle box sent DONE 
  • Sunbrella hatch covers  DONE
  • Remaining blocks, anchor shackles, clevis pins.  DONE 
  • repair profurl drum  DONE
    repair vang. - DONE   
    refurb penn reels   DONE
  • JST PH connectors DONE
  •  LOXX fasteners   DONE  
  • Teak pulpit seat DONE
  • 4c 22 cable for VEdirect  DONE
  • OXALIC acid DONE
  • pot lights 11ea DONE  AMCAR
  • reading lights 2 ea  DONE AMCAR
  • alloy screws for deadlights   DONE  AMCAR
  • 6c mocha pot  DONE
  • NMEA 2000 cables and Tees DONE AMCAR
  • Order DOW 795 DONE AMCAR
  • Rudder Cylinder   (DONE) AMCAR
  • FILES DONE AMCAR
  • sidecutters. Done
  • linesman pliers. DONE

MISC for later

  • 220v travel iron, bread make, popcorn?
  • sheet material - glass, rubber
  • better drill  DONE
  • sawzall
  • Hose clamps
  • Hefty hose 5/8 ID

To do while there

  • pack away bed boards. Done 
  • Clean area below main berth  DONE
  • stow parts and materials DONE
  • Sell surplus electrical  DONE
  • organize fishing gear DONE
  • jug of coolant DONE

Electrical

  • verify LiTime battery   DONE - its bad
  • remove inverter  DONE
  • install interior lighting  DONE

  • wire for trickle charger and remote inverter switch  DONE
  • wire for propane solenoid
  • wire for Ethernet and VEdirect  DONE
  • figure out where transom light is switched.  DONE
  • install sail-gen wiring box and cable gland   REplace cable instead - 10/2 boat cable
  • Install DST800   
  • Remove wind sensor cable (fish)
  • Remove Raytheon hardware  DONE
  • Install Stereo  DONE
  • Install new sender, chart plotter, wind  DONE
  • Install new gas detector/heat sensor
  • Install autopilot  DONE
  • Add add chafe protection to sonar cable  DONE 
  • Replace running lights with new Hella USCG LED (aboard, awaiting installation) 

Mechanical

  • repair mast chafe  seal coax.  DONE 
  • rebuild vang and install rebuilt genoa furler  DONE
  • install new roller and axles for anchor.    DONE 
  • Deal with hydraulic cylinder. Install new cylinder and ensure operation  DONE
  • service prop and anodes 
  • install lifelines and stanchions
  • replace 2 fixed plexiglass deck skylights  (ship for April 2024)  DONE
  • Determine helm pod suitability   DONE - ugh
  • Verify pump- play   DONE
  • replace 4 cable glands for hydraulic hoses.   split?  DONE
  • relocate heater (LATER)
  • relocate start battery (LATER)

document/inventory

  • Document staysail furler DONE
  • Document dc distribution DONE
  • Document through hulls
  • Document cockpit cushions
  • Document critical hoses 
  • Document required hand holds 
  • Document compass and pedestal cover design
  • Document bedding for sheets. DONE
  • Document engine belts 
  • Document engine mounts
  • Document foul weather gear  DONE
  • document blocks and rigging. Done 
  • document clothing   DONE
  • Document how to make and stow cutting board - sink/range cover and bulkhead mount.  ?  Done
  • Lifting harness for dinghy.
  • document first aid supplies   DONE
  • document spares  
  • document tools
  • template fitted Tool roll for wrenches
  • measure large hatches for bug screens
  • measure for Awning design.
  • through hull leak. Done
  • cert fire ext
  • cert life raft
  • replace running rigging  (ship for April 2024) 

Westec metal fab 


Supports in galley shelf behind stove are broken. Likely others will Follow
Silicone sheet for gasket 
Dimensions for hand holds 
Dimensions for Cockpit cushions 
How to secure teak slats on seats
What are tank lids? 
Template seat block
Can satellite antenna be moved?















Oct 2023

Meet
  • Ask shipyard about water blasting.

Prior to visit

apply for radio station license
make bow fitting, and stern seat, and hatch lid
buy more fabric
apply for MMSI
Apply for MI for HH
 Bottom Paint - choose and plan timing Dinr and communicated to JJ
Repair cb covers
Knife tray. Done 
Spare vane
Create graphics 


Do


  • Install nav lights
  • Grease and inspect masthead sheaves.

  • replace shore power outlet
  • Block windows with cardboard from supermarket  DONE
  • remove all stanchions.
  • assess pits in tanks.
  • check deck fill leak
  • determine tool storage strategy
  • Touch up paint
  • Inventory of blocks 
  • Determine galley drawers next steps  DONE

Measure/document/photograph

  • Engine mounts, including durometer stamp
  • Stanchion  sleeves in base
  • Sail handling!
  • Water tank lids, make, model, size.
  • Shelf in fridge   
  • heater hose
  • Anchor chain(s)

  • screws for deck portlights  DONE
  • Dimensions and photos of ac outlets   DONE 
  • Interior dimensions of oven and top of range 
  • Required anchor roller and sprit hardware DONEWhat is the dc infrastructure - shunt, fusing, switching?

Bring Home


  • Buy/Bring
  • Stanchion sleeves 
  • Spare vane 
  • Spare deck blocks
  • Larger blocks and shackles
  • adaptor for north american 30A shore power
  • blue and brown 12 or 10 awg TEW
  • seals kit and upper socket for maunal hydraulic pump
  • impact driver
  • M6X1mmX12mm hex bolts for rudder plate
  • Toiletries, towel, shower shoes, athletic shorts, sun shirt, and personal stuff
  • Phenolic sponges for SS. Done 
  • Hubbell parts. (Ordered fronAD April 6)
  • key tags. Ordered. Done 
  • Tefgel.  Done 
  • hangers
  • flat bar stock.
  • food canisters/mayo jars
  • HD cable ties
  • makita sanding discs
  • fishing line done 
  •  glass cloth, carbon, rollers.
  • knobs for boarding laddder
  • deck chairs
  • decals
  • solenoid
  • split loom  DONE
  • porta power/jack
  • pvc dinghy adhesive
  • better thermos
  • espar type heater hoses
  • 3X calframo fans
  • teak, oak
  • delrin slides


Prior list for March, italicized is complete.

Do  (Done)

  • Move stuff to sail locker 
  • Remove rudder cylinder  
  • replace disc, verify operation
  • Clean overall
  • Brush and vaccuum bilge
  • Clean water tanks. (Done but needs another go) 
  • Straighten stanchions. Determine which must be replace.  Done 
  • Template seat block Done
  • template sprit  Done
  • Install Deck Canvas
  • troubleshoot bilge pump. Done 

Europe 
  • GEBO portlight knob, other hardware

Measure and photograph

  • gas lines etc
  • Measure drawers Done
  • nook behind rangeDone
  •  closet rod, Done
  • broken catch, Done
  • sink drain hose per survey.
  • Stanchions, sleeve in base
  • Dimensions for hand holds Done
  • Dimensions for parts bins/tools. 
  • Cockpit cushions. Not required 
  • Template for teak slats on seats Done
  • Tool stowage Done.  not really
  • Prop shaft dia 1"  Done
  • size of ensign 36" w
  • dimensions of name lettering Done
  • bilge pump and hydraulic pump handles, Done
  • Triangle for rudder plate  Done
  • sink drain hose dimensions 
  • Water tank lids, make, model, size.
  • Cabin heater hose

Document and Photograph

  • Greases and lubricants  Done
  • Sail handling!
  • Carefully Sort sheets and sails.
  • Itemize pfd parts and foul weather gear  Done
  • More Clearly document Tools/spares Done
  • Itemize First aid Done
  • Itemize galley gear Done
  • Running light models Done
  • running light bulbs Done
  • Ensure electronic tuff has correct adaptors Done
  • Take all Batteries out Done
  • Verify harken power winch switch number  Done
  • any unused line that can be used for refit of running rigging.  

June trip

Meet

  • Arrange engine service
  • Edwin Versteeg $75 
  • Ask shipyard about water blasting.

Do

  • Clean water tanks. (Started) and install anodes 
  • gas lines etc. replace 
  • Remove boom/disassemble vang.
  • GEBO portlight knob
  • flush and wash bilge
  • free up furler.
  • Remove faucets from heads and determine next steps
  • Inspect/remove CB hydraulics and bushings
  • Block windows with cardboard from supermarket
  • Wash bedding
  • Rebuld shower pump and verify all pumps
  • remove rudder pin
  • remove stanchions.
  • remove bent anchor roller pivot bolt, stow anchor in locker 
  • Replace locks
  • make clothes rod supports
  • Sink drain from Erik 

Measure/document/photograph

  • Engine mounts, including durometer stamp
  • Measure drawer depth
  • Stanchion  sleeves in base
  • sink drain hose dimensions
  • Sail handling!
  • Water tank lids, make, model, size.
  • Shelf in fridge   
  • heater hose
  • Anchor chain(s)

Bring Home

  • Curtains
  • Vang Part

Buy/Bring

  • 10/3 boat cable
  • Hubbell shore power 
  • M6X1mmX12mm hex bolts for rudder plate
  • Toiletries, towel, shower shoes, athletic shorts, sun shirt, and personal stuff
  • 70mm mocha pot gaskets 
  • Fortress FX37 anchor  (March) 
  • New strum box for fwd shower.
  • Closet rod supports.   (Feb) 
  • Pots, (March)
  •  drawer fittings 
  •  cutlery
  • puller. (Made in March)
  • Anodes and hubs for water tank.  
  • sail bag
  • interior lighting - linear and Princess auto dome.?  (Ordered BA9s led and BA15 from Amazon) 
  • "Chinese" adaptor. (Made in April)
  • Phenolic sponges for SS
  • dielectric grease
  • Hubbell parts. (Ordered fronAD April 6)
  • Parts for rudder and cb (Ordered April 5 from alubat, ship to Canada)
  • Tools per list
  • key tags
  • interior lighting - LED bulbs for existing fixtures to start
  • Better wrenches and sockets
  • Alu pipe for vang?
  • Tefgel
  • Tefgel
  • Smoke alarm
  • Gas alarm
  • Hangers

Ship in advance 

  • Galley stove
  • Propane tanks
  • propane hose
  • Line for running rigging 
  • Bilge pump kits
  • Toilets/kits  kits 
  • Engine parts

Prior list for March, italicized is complete.

Do  (Done)

  • Move stuff to sail locker 
  • Remove rudder cylinder  
  • replace disc, verify operation
  • Clean overall
  • Clean water tanks. (Started) 
  • Straighten stanchions. Determine which must be replace.  Done 
  • Template seat block Done
  • template sprit  Done
  • Install Deck Canvas
  • troubleshoot bilge pump. Done 

Europe 
  • GEBO portlight knob

Measure and photograph

  • gas lines etc
  • Measure drawers Done
  • nook behind rangeDone
  •  closet rod, Done
  • broken catch, Done
  • sink drain hose per survey.
  • Stanchions, sleeve in base
  • Dimensions for hand holds Done
  • Dimensions for parts bins/tools. Not required 
  • Cockpit cushions. Not required 
  • Template for teak slats on seats Done
  • Tool stowage Done
  • Bulbs from rect.  fixtures
  • Prop shaft dia Done
  • size of ensign 36" w
  • dimensions of name lettering Done
  • bilge pump and hydraulic pump handles, Done
  • Triangle for rudder plate  Done
  • sink drain hose dimensions 
  • Water tank lids, make, model, size.
  • Cabin heater hose

Document and Photograph

  • Greases and lubricants  Done
  • Sail handling!
  • Carefully Sort sheets and sails.
  • Itemize pfd parts and foul weather gear  Done
  • More Clearly document Tools/spares Done
  • Itemize First aid Done
  • Itemize galley gear Done
  • Running light models Done
  • running light bulbs Done
  • Ensure electronic tuff has correct adaptors Done
  • Take all Batteries out Done
  • What are tank lids- cracked? 
  • Verify harken power winch switch number  Done
  • any unused line that can be used for refit of running rigging.  


Sent from my iPhone




No comments:

Post a Comment

Fitted Cutting boards

Will laminate a 36"X15"maple blank to create a  two cutting boards in the galley:    a  drop-in cutting board for the larger sink ...

Posts by Subject