Tuesday, 24 October 2023

Refit work completed as of August 2024

Rudder and Centreboard

  • all bushings, axles and hydraulic cylinders relating to the rudder and centreboard have been replaced with new parts supplied by Alubat in France. 
  • all cylinder pins replaced and installed with tefgel
  • system flushed, fluid replaced
  • Spare pins made for fixed end of both cylinders. 
  • Spare seals, fuses for hydraulic pump purchased.
  • worn Pivot pins replaced at pump.

Heads and plumbing

  • New Raritan PH2 superflush heads installed Oct 2023
  • New Osculati Olivia Faucets 17.019.00  Oct 2023
  • New Raritan rubber sanitation hoses, Oct 2023
  • forward head sink drain hose replaced per survey recommendations.  
  • Missing strum box replaced in fwd shower.  
  • All pumps are working, all electric (Jabsco) pumps have at least one spare and several rebuild kits.  
  • Plastimo manual bilge pump spares aboard

Galley

  • Converted to propane Mar 2023
  • 2 new composite propane tanks added, 2023
  • Propane hoses replaced mar 2023
  • Thick rubber matting installed in propane lockers 
  • new force 10 2 burner range installed Mar 2023
  • new Dickinson BBQ purchased Mar 2023
  • UK receptacles converted to Euro std. OCT 2023
  • New 220v appliances: toaster, rice cooker - Oct 2024
  • fitted cutlery drawer and new 18-8 flatware, melamine tableware, yeti mugs, salt and pepper mills. new stainless commercial cookware, coffee grinder etc etc  galley now outfitted to a high standard.

Rig, deck and hardware

  • new Alubat bowsprit purchased. Selden unit removed.  Oct 2023
  • Z-Spars vang rebuilt as new (install May 2024)
  • new garhauer cabin top clutches installed Sept 2024
  • New Z-Spars mast-base blocks purchased to replace owner-added blocks.
  • new halyard winch buttons installed Sept 2024.  Per survey
  • bent anchor roller pin removed, two replacements made, spares built.  Now fully renewed and operational 
  • Fortress FX37 purchased, with 20m chain plus 50m 7/8" rode. Fortress  FX 25 there also, with 10m chain and nylon rode, these two are backups to Rocna/chain bower anchor.  
  • All 8 GEBO hatches stripped and all acrylic lenses replaced along with any hardware Oct 2023, sumbrella covers for all hatches made, lenses are now protected in storage.  
  • Fixed Deck lights replaced with new plexiglass May 2024
  • Signifcant quantity of spare GEBO hatch parts and spare hatch lenses are aboard. .   
  • Profurl Genoa furler rebuilt and installed May 2024  Spare bearings, seals, and grease aboard. 
  • several lifeline stanchions replaced, new New lifelines installed Aug '24)
  • New running rigging shipped to boat for May 2024 

Canvas/Fabrics/interior

  • Dodger refurbished, new windows with shade.  (Oct 2023)
  • mainsail lazybag refurbished.
  • Bimini canvas refurbished.
  • Interior curtains replaced with new.
  • broken door catch replaced
  • GEBO mosquito screens for two main cabin hatches purchased
  • Sunbrella covers made for deck hatches.
  • Spare LOXX fasteners and installation tools in inventory.
  • Extensive "bosun's kit" for sail and fabric repair now aboard.  

AC Power

  • Victron Automatic isolation transformer added  (galvanic isolator removed)   Oct 2023
  • Victron multiplus 1600w inverter/charger added (Victron Centaur 60A charger removed)  Oct 2023
  • Victron Orion DC:DC charger at boat but not installed. Oct 2023
  • Victron CerboGX and Multiplus 800W 125V inverter installed May 2024
  • IEC style receptacle added in cockpit locker, and in galley as above) Oct 2023
  • IEC 220v receptacles replaced all UK standard.
  • AC wiring brought to std.
  • New (Ground lifted) hubbell shore power inlet installed Aug 2024

12VDC Power

  • 2ea 230 AH Lithium batteries installed Aug 2024, 
  • wiring and circuit protection of batteries brought up to standard,
  •  SEA-GEN damaged bracket and pin replaced, cable replaced with longer per survey.  Operation verified.  
  • D400 wind generator removed.  
  • All interior lighting replaced with LED, May 2024
  • red lighting incoprporated throughout for night sailing.  
  • 12vdc Distribution/switch panel revised to consolidate lighting
  • switching and panel layout simplified and relabelled to maximize intuitive operation and reliability.
  • 2 ea 6 section fuse blocks added to consolidate protection and wiring.
  • Wiring and panel labels updated. 
  • Lynx distributor and shunt added with correctfusing and new battery cables.   Battery hold downs and battery box revised.   (now bulletproof)
  • Victron Cerbo GX installed and commissioned for integrated monitoring and control of energy systems.  

Electronics 

  • Fusion RA 670 stereo, b&G wwireless wind and air mar dst810 installed May 2024
  • Standard horizon GX1850 dual station VHF installed
  • NMEA2000 network installed, labelled.  Cables consolidated secured and protected from chafe.
  • NMEA2000 network schematic created and laminated to be retained at boat.
  • network wiring inside nav station revised, labelled, simplified and secured.  
  • consolidated, labelled  fuse blocks added at Nav station for reliability and ease of troubleshooting.
  • zeus3 7” cockpit chartplotter installed Sept 2024
  • Wind instruments replaced, per survey.

Other

  • All hardware and equipment parts and model numbers and serial numbers, fully documented, including all equipment, spares, tools. 
  • New Makita 18V tools, Grinder, Jigsaw, ROS, two drills, oscilllating multitool, corded grinder and bosch sander. 
  • Comprehensive range of hand tools also aboard consistent with self sufficency.  Mechanical, wood, metalworking electrical.  
  • Spare pumps, seals and various fasteners, electrical and other materials and rebuild parts consistent with self sufficiency are now in inventory on board.  
  • All lines and spare rope documented, inspected and whipped.  Worn or otherwise unserviceable line discarded.
  • Comprehensive ditch bag assembled in ACR ditch bag.
  • EMS level first aid kit added to supplement already comprehensive first aid supplies on board.
  • Musto offshore HPX drysuit and Musto offshore foul weather gear aboard.
  • Offshore "big game" fishing gear now aboard. 
  • MMSI numbers registered, EPIRB and NAIS500 reprogrammed.
  • All winches fully serviced, Feb 2025
  • New anodes installed and prop fully serviced Feb 2025 

Next: 

  • Replace running lights with new Hella USCG LED (aboard, awaiting installation) 
  • replace running rigging  (line already aboard) 
  • Install new gas detector/heat sensor
  • certify fire extinguishers.
  • repair radar
  • service mainsail and genoa
  • remove Inmarsat and wind generator.
  • Complete repaint