Sunday 12 March 2023

Refit: Project Plan?

 

Seaworthy:

  • Engine, and powertrain serviced.
  • Steering and controls serviced.
  • Propellor serviced.
  • All sails and running rigging serviced and verified.
  • ground tackle and safety gear operational.   
  • Navigation equipment running and reliable.
  • Autopilots fully operational.
  • Electrical system, nav lights fully operational
  • Repair vang.
  • Repair rudder hydraulics and slider. *. Sliders ok.  Bushings aren’t
  • Repair hydraulic pump. *
  • Troubleshoot bilge pump.  *  (done. was miswired.)
  • Rebuild manual bilge pump.
  • Correct fault in shore power inlet installation. *. Will replace with hubbell 
  • Cutlass bearing ok

Passage Worthy   DONE

  • Plan for Cooking,    
  • sleeping, 
  • fresh water, 
  • Rebuild head pumps or replace.
  • basic comforts, 
  • First aid kit update.
  • clothing 
  • foul weather gear.  
  • Adequate diesel fuel.
  • Straighten and replace stanchions as required.  (done, will order 2)
  • Resolve drifter tack arrangement. 

Live aboard

  • galley properly equipped.
  • comprehensive tools.  
  • entertainment.  Has decks of cards lol
  • clothing.  None to speak of 
  • dinghy
  • swimming/snorkeling. (One set flippers present)
  •     bicycle?
  • shopping
  • shore clothes
  • Cosmetics and refinements to rig and boat.

No comments:

Post a Comment

Fitted Cutting boards

Will laminate a 36"X15"maple blank to create a  two cutting boards in the galley:    a  drop-in cutting board for the larger sink ...

Posts by Subject